Design & Build Data Center

Design & Build Data Center

 




Cementerized Raised Access Flooring


Cementarized plate basses are the high-grade ones developed by environment friendly material.

This kinds of plate bases have good bearing , waterproof, fireproof and anti-magnetic capabilities, are the first choices as high-grade computer room's floor base at home and abroad





 

 
Ceramic Raised Access Flooring (Anti-Static)


Specifications Fire rating:A grade. Cold-rolled steel plate.

Concavity of panels not exceed 0.5mm.

Cement infill steel panel with 10mm ceramic finish 1.

Panel squareness:within ±0.25mm. 2.Panel dimension.
 

Design & Build Data Center

 





Full Steel Anti-rust Perforated Raised Floor


The structure of ventilation floor is similar with that of anti-static full-steel raised floor but it has hollow cavity without foam stuffing.

The upper and lower steel paltes and upper cover of the floor are all punched with ventilation holes.

Matched with the full-steel raised floor, the ventilation raised floor is used in the place where ventilation is required under the floor, and the ventilation rate of the floor is 17%-50%

 

 




Fire Suppression System


Gas suppression system shall be the means of protection for the DC.

The Gas Storage Cylinders shall be located within a dedicated area located adjacent to the protected room.

The activation of the Gas Suppression System shall be controlled by smoke detector activation located in the protected areas.

The option of providing a 'change over switch' to enable the automatic or manual activation of the system shall be provided.

The fire protection system shall be designed to comply with “NFPA” standards & Local Codes and Regulations.

Existing Building Water Sprinkler Nozzle in the Data Centre shall be “depressurized” and removed “IF ANY”.









Design & Build Data Center

 












Fire Rated Partitioning











 


Uninterruptible Power Supply (UPS)

 








Design & Build Data Center

 





Cooling System






 











Environment Monitoring System










 








Design & Build Data Center

 




Raised Flooring, Racking, and Cable management design, 3D drawing and feasibility Study


Cable Management on the shown diagram are Cable Basket Concept that provide a clean and easy cable management solution for Data Center.

A 3D flooring is design upon proper and accurate flooring system to be install in a Data Center to avoid wrong positioning of Racking & other Data Center Equipment.

​A proper Racking system plays important state in Data Center is the proper positioning, as the diagram shown a clean and right location is coordinated with the Raised Flooring & Cable Management System.

 
 


Copyright © 2008-2018 BREITKOM Network Sdn Bhd, All Rights Reserved.